Q: How long does it take of the installation and trial running of wire drawing machine take?
A: If foundation and everything is prepared, time of installation and trial running is about 10 working days. Then it can be put into usage.
Previous:What is usage of Wire Drawing Powder?
Next:Q: Give me an idea on the operation of wire drawing machine?